內(nèi)蒙古創(chuàng)源金屬有限公司動(dòng)力站一期6x330MW機(jī)組#2封閉煤場項(xiàng)目
發(fā)布日期:2023-04-20 瀏覽次數(shù):369
工程位于內(nèi)蒙古霍林郭勒,建筑面積40000 ㎡,跨度為100m,總用鋼量約2000t。工程內(nèi)容包括封閉煤場鋼網(wǎng)架、鋼檁條、單層壓型彩板、陽光板、防腐油漆、防火、五金配件、封閉煤場本體的防雷接地(以斷接卡為界限)、電氣照明及安裝檢修用平臺(tái)(馬道)和扶梯等。
6x330MW Unit 2# of power station phase I of coal enclosure project for Inner Mongolia Chuangyuan Metal Co., Ltd.
The project is located at Huolingole, Inner Mongolia, with a construction area of more than40000 ㎡, a span of 100m, and a total steel consumption of about 2000 tons. The project scope includes closed space frame, purlin, single-laminated cladding sheet, sunlight sheet, anti-corrosion paint, anti-fire , Hardware accessories, lightning & earthing of the closed coal yard (bounded by the disconnect card), electrical lighting and maintenance platform (horse road).
- 上一篇:淮北渙城發(fā)電有限公司二期煤廠全封新EPC工程
- 下一篇:無